![]() IMPORTANT: After installation is completed, ensure all bolts are tightened.Ģ.5.2 Aligned the wall brackets to the wall mounting track kits, then install the wall brackets to the wall mounting track kits using channel nuts. ![]() NOTE: Tightened the bolts that are used to attach the wall bracket to the wall or wall kits 1st before the bolts that are used to attach the wall bracket to the end panel. Install the shelving unit to the floor mounting track by sliding bolts in the mounting tracks, and putting a screw in the last rear slot of the end panels of the shelving unit.Ģ.5.1 Aligned the wall brackets to the plus nuts, then install the wall brackets to the wall.Lift the shelving unit inside the van, then put it in place.The 6490 plus nut tool can be ordered separately upon demand at no charge.Īssemble the 6491 plus nut tools with the hardware needed, plus the nut and the 9/16″ wrench as shown.Īttach the plus nut in the hole by turning the bolt forward using an impact with a 1/2″ socket until the plusnut locks, then remove the bolt by turning the impact in reverse.Ģ.4.1 Put the assembled shelf back in place aligning the holes to the plus nuts, then install the end panels to the plus nuts. NOTE: The hardware used for the 6490 plus nut tool is not included in the fastener bag. STEP: Put the plus nut on the Plusnet gun, then attach the plus nut in the hole by turning the gun forward until the plus nut locks, then remove the gun by turning it in reverse. WARNING: Before drilling, ensure that you will not hit any critical parts of the vehicle like the Gas tank, Wiring Harness and Hose. NOTE: Use a 1/2″ drill bit with a drill collar to stop the drill at 1/2″ depth. Drill all the marks using a 1/2″ drill bit w/ drill collar, then attach plus nuts to the holes.Attach the short and long brackets to the panels aligning the brackets to the horizontal rim of the vehicle.Ģ.2.1 After attaching the brackets mark the holes on the brackets and end panels to the vehicle.Lift the assembled shelf to the vehicle, then put it in place.IMPORTANT: For all Box Trucks, make sure that the shelving is securely fastened to the structure of the truck. PHASE 2 – INSTALLATIONĢ.1 ATTACH WALL BRACKETS TO THE END PANELS IMPORTANT: Always handle panels on a smooth, protected and clean surface to avoid unnecessary scratching. NOTE: You can adjust the bottom shelf location to maximize or minimize your space over the wheel. The standards should be just barely snug against the wall if you drive the screws in too far, you may damage the wall surface.1.2.1 Attach both panels to the shelf trays. Poke awl holes and drive screws into each remaining screw hole location in the standard, making sure it's positioned perfectly plumb. Sturdy metal material with gray powder-coated finish is durable, chip- and corrosion-resistant. This double track, heavy duty bracket is used with double track shelving standards to create adjustable system for shelf boards. Plumb is indicated when the bubbles in the top and bottom vials are centered. 9.53-in L x 0.55-in W x 2.12-in D Heavy Duty Gray Shelf Bracket. Set your level alongside the standard, adjusting the position so that it is perfectly plumb (that is, vertical). This will make it easier to set and drive the screw.ĭrive a screw through the top hole, just deep enough to hold the standard in place securely don’t make it so tight that you can’t move the standard a little. Shop shelving brackets & hardware and a variety of storage & organization products online at. When you are satisfied with the location, stick an awl through the top screw hole in the standard, marking a small indentation in the wall. Find shelving brackets & hardware at Lowes today. Set the first standard in place at the intended height, centered over a stud. It is easiest to attach shelf standards with a helper, although it's possible to do the job yourself. The Spruce Home Improvement Review Board.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |